Loh Fook Yuen - JI
·
Choong Choon Guan - GPL
·
Goh Soon Huat - JI
2. DUTIES
& RESPONSIBILITIES OF ADMIN STAFF
The
basic duties and responsibilities of the Admin Staff are outlined in Appendix
‘A’.
3.
TYPING & FILING
3.1
All draft letters to be
typed by the Admin Staff should be passed directly to the secretaries for
action.
Alternatively, the engineers may choose to type the letter themselves.
The draft letters should be emailed to the Secretary for re-formatting (where
necessary), printing, arranging for attachment (if applicable), signature and
issuance.
3.2
Filing duties will be
allocated based on the projects filing list.
4.
OUTGOING CORRESPONDENCES AND
THEIR ISSUANCE
The guidelines are shown in Appendix ‘B’.
5.
SIGNATURE FOR OUTGOING CORRESPONDENCES
The guidelines are shown in Appendix ‘C’.
6.
THE USE OF EMAILS
The guidelines are shown in Appendix ‘D’.
Daily clearance of incoming/outgoing emails
will be carried out by the Admin Staff in regular intervals as follows:
8.30am – 1.00pm - JI
1.00pm – 5.30pm - GPL
7.
INCOMING & OUTGOING
MAILS
7.1
All
incoming letters/drawings/documents received by normal mail or by hand should
be placed in the ‘Incoming Mail Tray’ for recording by Administrative Assistant
before circulating to the Project Managers.
7.2
All
outgoing letters/drawings/documents to be issued by post, courier or by hand should
be placed in the ‘Out’ Tray or pass to the Secretaries who will then sort out
the letters, including the attachments, before issuance.
8.
EXTERNAL PRINTING
For the printing of A4 size documents in
bulk (such as contract documents), the Engineering Staff are required to fill
up the ‘Requisition Form for Photocopying/Binding of Documents’ and
subsequently, submit the completed form to Administrative Assistant to make the
necessary arrangements.
9.
CLEARANCE OF INCOMING FAXES
& OUTGOING CORRESPONDENCES
Daily clearance of incoming faxes & outgoing
correspondences will be carried out by the Admin Staff in regular intervals as
follows:
8.30am – 1.00pm - GPL
1.00pm – 5.30pm - JI
10.
CLEARANCE OF DOCUMENTS FROM
ENGINEERS’ ‘OUT’ TRAYS
All documents in director/engineers’ ‘Out’
Tray will be cleared regularly by the Admin Staff as follows:
3.00pm - GPL/JI
11.
MASTER CORRESPONDENCES/EMAILS
11.1
All
incoming faxes will be filed as soft ‘Incoming’ in respective projects under
the ‘Correspondence’ directory in the computer network.
11.2
All
outgoing correspondences (letter/fax/transmittal) will be filed as soft
‘Outgoing’ in respective projects under the ‘Correspondence’ directory in the
computer network. The hardcopy will be filed in the paper file in accordance to the filing system.
11.3
Copies
of all incoming and outgoing emails will be filed in respective projects in the
‘EEF’ under ‘Public Folder’ in the Outlook Mail server.
APPENDIX ‘A’
SUMMARY OF BASIC DUTIES & RESPONSIBILITIES OF ADMIN
STAFF
|
JI (Julaila Ismail) |
GPL (Janicia Goh) |
ADMINISTRATIVE ASSISTANT |
|
Provide
secretarial support to LFY (submission of transport claims, etc) |
Provide secretarial
support to CCG (making drinks, submission of transport claims, etc) |
Provide
secretarial support to GSH (submission of transport claims) |
|
Typing & filing of
project correspondences/ specifications |
Typing and filing of
project correspondences/ specifications |
Attend
to incoming calls, take messages as required & redirect calls to
appropriate staff, attend to visitors and direct them to appropriate contacts |
|
Typing of fee proposals |
Typing of fee proposals |
Update
daily staff attendance and movement |
|
Distribute emails in EEF
& clear spam emails in the Quarantine folder |
Distribute emails in EEF
& clear spam emails in the Quarantine folder |
Distribute
emails in EEF & clear spam emails in the Quarantine folder |
|
Clear incoming faxes and outgoing
correspondences |
Clear incoming faxes and
outgoing correspondences |
Record
incoming drawings & mails and distribute correspondences, etc. to
designated personnel |
|
Maintain master files for
project correspondences |
Transfer fee proposals to
PP folders |
Clear
incoming faxes and outgoing correspondences |
|
Maintain and update
Master Specifications |
Transfer emails from ACE
& RFP mailboxes to respective PP and SP-Confidential folders |
Clear
documents from engineers’ ‘Out’ Tray |
|
Update mailing list for
festive greeting cards |
Update mailing list for
festive greeting cards |
Typing
& filing of project correspondences/ specifications |
|
Update M&E Contractor
Register |
Update Project Allocation
List |
Arrange
& coordinate courier services and outgoing mails and the servicing of
copiers |
|
Perform the role of
Document Controller relating to QEMS |
Perform the role of
Librarian |
Refill
paper trays in copiers and replenish stationery, postage stamps, copier
toners, etc and maintain tidiness of stationery
cabinet |
|
|
|
Update
address book and ensure that the contacts are up-to-date |
|
|
|
* Archive
of project documents |
|
|
|
* Arrange
for contract document binding/printing |
|
|
|
* Label
central trays & filing cabinets |
|
|
|
* Make preparations for lunch meetings / discussions |
APPENDIX ‘B’
1.
Outgoing Correspondences Format
and Mode of Transmission
|
|
Type of Outgoing Correspondence |
To be indicated |
Mode of Transmission |
|
1 |
Letters |
|
|
|
|
-
Fee proposal |
-
Project number -
Reference number -
Project title -
Subject matter |
By Courier/Email/E-submission/Hand/Post |
|
|
-
Site supervisory recommendation
letter |
By Email &/or Post |
|
|
|
-
Billings |
By Email/Post/E-submission |
|
|
|
-
Prequalification of tenderers
including recommended list of tenderers |
By Email & Post |
|
|
|
-
Invitation letters to tenderers |
By Email & Self-Collection |
|
|
|
-
Tender addenda |
By Email &/or Post |
|
|
|
-
Tender clarifications |
By Email &/or
Post/Self-Collection |
|
|
|
-
Contract award letter |
By Email & Post |
|
|
|
-
Payment certification |
By Email & Post |
|
|
|
-
Studies and reports |
By Email & Post |
|
|
|
-
Cost estimates |
By Email & Post |
|
|
|
-
Letters to Authorities regarding
application, submission, clarification and approval except for e-submission |
By Email &/or Post |
|
|
|
-
Minutes of meetings |
By Email Only |
|
|
|
-
Letters with cost and/or contractual/legal
implications |
By Email & Post |
|
|
|
-
Variation orders, Engineer or
Architect Instruction |
By Email & Post |
|
|
2 |
Transmittal |
-
Project number -
Reference number -
Project title -
Subject matter |
By Email & Self-Collection/ By Hand |
|
3 |
Email |
-
Subject matter -
Project Email Address |
- |
Note:
Mode of transmission should be
indicated as appropriate on the top right hand corner
of the letter before transmitting it
2.
Correspondences to copied
parties should be issued as the original; however, the attachment should ONLY
be included where relevant.
3.
Transmittals are used
basically as covering letters for the issuance of drawings, documents, etc.
4.
Courier services should ONLY
be used under the following circumstances:
4.1
Bulky drawings, reports or
documents
4.2
Meet tight deadline
For the same correspondence, courier services need not be
used for delivery to all parties concerned, unless otherwise stated.
Reminders to All Staff:
1.
Before leaving the office
for a meeting, do ask the Admin Staff if they have any documents to be
delivered to the meeting venue and help to hand over the documents to the
addressee.
2.
After each meeting outside
the office, do ask the host’s receptionist if they have any documents intended
for us awaiting delivery and help to bring the documents back to the office.
3.
When requesting for courier
service to make a despatch, do ask the Admin Staff to
check if any of our Staff is heading for the same destination for meeting or
the addressee (or his representative) is coming our way for meeting; please ask
the person concerned to make the delivery.
APPENDIX ‘C’
GUIDELINES ON SIGNATURES FOR OUTGOING CORRESPONDENCES
Outgoing
letters relating to the following issues should carry AUTHORISED signatures as indicated below:
|
Item |
Issues |
Signatories |
|
|
Company
Financial Matters, Government Surveys, Contractor’s Performance Reports,
Testimonials and the like |
Managing
Director/Director-in-Charge |
|
|
Prospective
Project enquiries and fee proposals |
Managing
Director/Director-in-Charge |
|
|
Prequalification
of tenderers including lists of recommended tenderers, tender reports, cost
plans, site staff requirements, design brief, engineering & cost studies,
completion certificates and the like |
Managing
Director/Director-in-Charge. However Project Manager
will be allowed to sign with prior knowledge of the Project Director. |
|
|
Tricky or
contractual issues where Company’s position/reputation may be at stake or
compromised |
Project Director |
|
|
Letters of
invitation to tender, payment certificates, recommendation on acceptance of
variation orders |
Project
Director. However Project Manager will be allowed to sign with prior knowledge of the Project
Director |
|
|
Approval of
technical submittals, minutes of technical meetings, instructions to
contractors etc. |
Project Manager
or Assistant Project Manager |
|
|
Applications/submissions/certificates
to Authorities |
The Professional
Engineers and/or Licensed |
|
|
General &
routine issues |
Project Manager
or Assistant Project Manager generally based on the discipline involved. The
Project Assistant may be authorised by the Project
Manager/Assistant Project Manager to sign simple letters which are routine in
nature and with no contractual implications. |
|
1.
Outgoing Emails
1.1
Outgoing emails should
include the subject matter and project email address.
1.2
The originator/Secretary/Admin
Assistant shall type and send the email to external parties and also copy to project
email address.
2.
Incoming Emails
2.1
The Secretary/Admin
Assistant shall forward all incoming emails to the Project Team, as
appropriate, for attention.
2.2
All incoming emails
containing drawings and/or large-scale work programmes
and the like, requiring action by the CAD Staff for printing or storage in
server, shall be copied to the ‘CADMail’ with proper
instructions.
2.3
These emails are filed
according to Projects.
3.
Internal Emails
3.1
For internal emails pertaining
to projects such as notes of meetings, confirmation of technical requirements
etc., the hard copies should be filed in the relevant project files.
For file copy, the originator shall copy it to IEF.
3.2
Likewise, for Office
Instructions/Memoranda and the like issued via email, hard copies, where
necessary, should be filed in the respective files.