List of
Site check-lists
|
|
Refer No. |
Inspection Check List |
|
1 |
Air Conditioning and Mechanical Ventilation |
|
|
|
Inspection Check List for AC Expansion/Make-up Water Tank Installation |
|
|
|
Inspection Check List for AC – Split Unit Installation |
|
|
|
Inspection Check List for Electrical Installation of ACMV System and
Plants |
|
|
|
Inspection Check List for Air Handling Unit (AHU) Installation |
|
|
|
Inspection Check List for Insulation for Air Duct/Water Pipe
Installation |
|
|
|
Inspection Check List for Car Park Ventilation Installation |
|
|
|
Inspection Check List for Chiller /Condenser Water Pumps Installation |
|
|
|
Inspection Check List for Chiller /Condenser Water Pipe Installation |
|
|
|
Inspection Check List for Chiller Installation |
|
|
|
Inspection Check List for Electrical Conduit/Trunking/Tray/Ladder
Installation |
|
|
|
Inspection Check List for Cooling Tower Installation |
|
|
|
ACE/CL/A/112 |
Inspection Check List for M&E Services Installation for False
Ceiling Closure |
|
|
ACE/CL/A/113 |
Inspection Check List for Fan Coil Unit (FCU) Installation |
|
|
ACE/CL/A/114 |
Inspection Check List for Fire Damper Installation |
|
|
ACE/CL/A/115 |
Inspection Check List for Mechanical Ventilation Fan Installation |
|
|
ACE/CL/A/116 |
Inspection Check List for Pumps Installation |
|
|
ACE/CL/A/117 |
Inspection Check List for Subsidiary Control Panel (SCP) Installation |
|
|
ACE/CL/A/118 |
Inspection Check List for Air Duct Installation |
|
|
ACE/CL/A/119 |
Inspection Check List for Refrigerant Pipe Installation |
|
|
|
|
|
|
|
|
|
2 |
Fire Fighting and Alarm Installation |
|
|
|
ACE/CL/F/201 |
Inspection Check List for Breeching Inlet and Valve Chamber
Installation |
|
|
ACE/CL/F/202 |
Inspection Check List for Electrical Conduit/Trunking/Tray/Ladder
Installation |
|
|
ACE/CL/F/203 |
Inspection Check List for M&E Services Installation for False
Ceiling Closure |
|
|
ACE/CL/F/204 |
Inspection Check List for Fire Alarm System Installation |
|
|
ACE/CL/F/205 |
Inspection Check List for Fire Fighting Water Tank Installation |
|
|
ACE/CL/F/206 |
Inspection Check List for Hose Reel Installation |
|
|
ACE/CL/F/207 |
Inspection Check List for Fire Hydrant Installation |
|
|
ACE/CL/F/208 |
Inspection Check List for Pumps Installation |
|
|
ACE/CL/F/209 |
Inspection Check List for Subsidiary Control Panel (SCP) Installation |
|
|
ACE/CL/F/210 |
Inspection Check List for Sprinkler Pipe and Control Valve Installation
|
|
|
ACE/CL/F/211 |
Inspection Check List for Wet / Dry Riser Pipe and Landing Valve
Installation |
|
|
|
|
|
|
|
|
|
3 |
Electrical Installation |
|
|
|
ACE/CL/E/301 |
Inspection Check List for Cable Chamber (Substation) Installation |
|
|
ACE/CL/E/302 |
Inspection Check List for Electrical Cable Installation |
|
|
ACE/CL/E/303 |
Inspection Check List for Electrical Conduit/Trunking/Tray/Ladder
Installation |
|
|
ACE/CL/E/304 |
Inspection Check List for Distribution Board (DB) Installation |
|
|
ACE/CL/E/305 |
Inspection Check List for PowerGrid Meter Compartment Installation |
|
|
ACE/CL/E/306 |
Inspection Check List for M&E Services Installation for False
Ceiling Closure |
|
|
ACE/CL/E/307 |
Inspection Check List for Generator Installation |
|
|
ACE/CL/E/308 |
Inspection Check List for Underground Lead-in Pipe Installation |
|
|
ACE/CL/E/309 |
Inspection Check List for Lightning Protection Installation |
|
|
ACE/CL/E/310 |
Inspection Check List for LV Switch Room Installation |
|
|
ACE/CL/E/311 |
Inspection Check List for ‘Power Supply’ Substation Installation |
|
|
ACE/CL/E/312 |
Inspection Check List for Electrical Switches, SSO and Isolator
Installation |
|
|
ACE/CL/E/313 |
Inspection Check List for Transformer Room (Substation) Installation |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
4 |
Plumbing, Sanitary and Gas Installation |
|
|
|
ACE/CL/P/401 |
Inspection Check List for Domestic Cold and Hot Water Pipe Installation
|
|
|
ACE/CL/P/402 |
Inspection Check List for Electrical Conduit/Trunking/Tray/Ladder
Installation |
|
|
ACE/CL/P/403 |
Inspection Check List for Domestic Water Tank Installation |
|
|
ACE/CL/P/404 |
Inspection Check List for M&E Services Installation for False
Ceiling Closure |
|
|
ACE/CL/P/405 |
Inspection Check List for Gas Pipe Installation |
|
|
ACE/CL/P/406 |
Inspection Check List for Pumps Installation |
|
|
ACE/CL/P/407 |
Inspection Check List for Sanitary Pipe (external in construction
stage) Installation |
|
|
ACE/CL/P/408 |
Inspection Check List for Sanitary Pipe (external in commissioning
stage) Installation |
|
|
ACE/CL/P/409 |
Inspection Check List for Sanitary Pipe (internal) Installation |
|
|
ACE/CL/P/410 |
Inspection Check List for Subsidiary Control Panel (SCP) Installation |
|
|
ACE/CL/P/411 |
Inspection Check List for Sewer Pumps Installation |
|
|
ACE/CL/P/412 |
Inspection Check List for Water Bulk Meter and Valve Chamber
Installation |
|
|
|
|
|
|
|
|
|
5 |
Swimming
pool filtration system |
|
|
|
ACE/CL/SW/501 |
Inspection Check List for Electrical Conduit/Trunking/Tray/Ladder
Installation |
|
|
ACE/CL/SW/502 |
Inspection Check List for Pumps Installation |
|
|
ACE/CL/SW/503 |
Inspection Check List for Subsidiary Control Panel (SCP) Installation |
|
|
ACE/CL/SW/504 |
Inspection Check List for Swimming Pool Filtration Installation |
|
|
|
|
|
|
|
|
|
6 |
Lift
and escalator installation |
|
|
|
ACE/CL/L&E/601 |
Inspection Check List for Escalators/Passenger Conveyer Installation |
|
|
ACE/CL/L&E/602 |
Inspection Check List for Lift Installation |
|
|
|
|
|
7 |
General
|
|
|
|
ACE/CL/G/701 |
RI
Combined test |
|
|
|
|
|
|
Refer
No. |
Testing
and Commissioning Check List |
|
|
ACE/T&C/801 |
Testing
and commission of Pumps |
|
|
ACE/T&C/802 |
Testing
and commission of Mechanical Fans |
|
|
ACE/T&C/803 |
Testing
and commission of Chiller |
|
|
ACE/T&C/804 |
Testing
and commission of Fan Coil Unit |
|
|
ACE/T&C/805 |
Testing
and commission of Air Handling Unit |
|
|
ACE/T&C/806 |
Testing
and commission of Swimming Pool Filtration System |
|
|
ACE/T&C/807 |
Testing
and commission of AC Multi/Single Split Unit Installation |
|
|
ACE/T&C/808 |
Testing
and commission of Air Flow Measurement of AHU/FCU/MV Fan Installation |
|
|
ACE/T&C/809 |
Testing
and commission of Insulation Test for Electrical Installation |
|
|
ACE/T&C/810 |
Testing
Procedure for LV Bus-duct Installation |
|
|
ACE/T&C/811 |
Testing
Procedure for Transformer AC High Voltage Test |
|
|
ACE/T&C/812 |
Testing
and Commissioning of High Pressure Air Test for Sanitary Plumbing System |
|
|
ACE/T&C/813 |
Testing and
Commissioning of Low Pressure Air Test for Sanitary Plumbing System |
|
|
ACE/T&C/814 |
Testing
and Commissioning of Water Tightness Test of Sanitary Drainage (underground)
System |
|
|
|
|
|
|
Refer
No. |
Standard
Form |
|
|
|
M&E RTO – Site Dairy |
|
|
|
Site
Memorandum (M&E) |
|
|
|
Request
for Inspection |
|
|
|
M&E
Site Photo |
|
|
|
Summary
of Site Inspection Form |
|
|
|
M&E
Defect List |
|
|
|
Summary
of M&E Site Memorandum Issued |
|
|
|
Summary of
Architect/Engineer’s Instruction/Direction
|
|
|
|
Summary
of Request for Information Form |
|
|
|
Approval
Materials / Equipment List |
|
|
|
Approval
Shop Drawing List |
|
|
|
Authorities