GUIDELINES FOR LOAD ESTIMATE

 

GUIDELINES FOR LOAD ESTIMATE

APARTMENTS

Information Required

 

·         No. of Units per Storey

·         No. of Rooms per Unit

·         Gross Area per Unit

·         Other gross floor area

·         Any basement carparks? (sprinklers & MV)

·         Layout/Site Plan

·         Location

·         Whether fully a/c or only bedrooms

Load Estimate

1.1               Obtain air-conditioning loads, pumps, car park fans, etc.  from Mechanical Department.

1.2               If item above  is not available, work out a/c load as follows:‑

1.2.1          If the breakdown of area within the apartment is known, then

A/C Load              =             3/4 ton per bedroom + 250 sq ft/ton for other a/c areas.

1.2.2          If only the total area of the apartment is known, then

A/C Load              25 sq m/ton (if fully a/c).

1.2.3          A/C Electrical Load           1.2 KW per ton.

1.2.4          Diversity factor for A/C  =             say 0.8.

1.3               Other Loads :     Say 3 to 5 KW per unit (ADMD)

(inclusive of lifts, landlord's lighting, pumps, apartment lighting and appliances, etc.).

1.4               Instead of working out 1.2 & 1.3, allow 12 KVA per unit (includes landlord and tenants' load). This figure may not be sufficient in some cases where the units are very large and fully a/c. Also for developments with carpark mechanical ventilation system, the loads should be considered (allow 10 to 15 w/m2 for MV electrical load).

GUIDELINES FOR LOAD ESTIMATE

OFFICES

Information  Required

·         Nett Area per Floor

·         No. of Floors

·         Gross Area excluding Carparks

·         Carpark Area

·         Floor Plans

·         Location Plan/Site Plan

·         Usage of Building

 

            Load Estimate

    1.1        Obtain air-conditioning loads, pumps, car park fans, etc.  from Mechanical Department.

    1.2        If not available, work out as follows:-

Maximum Demand =                      A/C Tonnage x 1.4 KW/ton (inclusive of chillers, cooling towers, pumps & AHUs) + Carpark Area x 10 to 20 W/m2 + Gross (excluding carpark) x 20 to 30 w/m2

OR

Maximum Demand =                       Gross (excluding carpark) x 60 to 70 W/m2

+ Carpark Area x 10 to 20 w/m2

OR

Maximum Demand =                       Gross (including carpark) x 50 to 60 W/m2