Item |
Description |
Check |
Remarks |
||
1 |
Confirm
brand, rating (prime), voltage, frequency, engine, alternator model are correct
and based on tender/ contract specifications: |
|
|
||
|
|
|
Tender Offer |
Actual
Submission |
|
|
|
|
a.
Diesel Engine Brand |
|
|
|
|
|
|
b.
Alternator Brand |
|
|
|
|
|
|
c.
Engine Power (kW) |
|
|
|
|
|
|
d.
Alternator Rating (kVA) |
|
|
|
|
|
|
e.
Voltage/Frequency |
|
|
|
|
|
2 |
Enclosure
Noise level |
|
|
||
|
a.
Specified: Max ____ dBA at 1 m. (usually 75 dBA) b.
Offered : ___________________ |
|
|
|||
|
3 |
Parts
of genset are correctly labelled on drawings |
|
|
||
|
|
a.
Diesel Engine |
|
|
||
|
b.
Alternator |
|
|
|||
|
c.
Radiator |
|
|
|||
|
|
d.
Silencer |
|
|
||
|
e.
Control Panel |
|
|
|||
|
f.
Fuel Tank with capacity indicated |
|
|
|||
|
4 |
Output
breaker rating is correct Specified
: ________________ Amp (TPN / 4-Pole) Offered
: _________________ Amp (TPN /
4-Pole) |
|
|
||
|
5 |
Confirm
size and height of canopy set can fit into space allocated. Minimum
maintenance space of 0.9m all around canopy should be provided. Check that doors
can be fully opened without hindrance. |
|
|
||
|
6 |
Check
orientation and location of genset with respect to
site and site constraints |
|
|
||
|
7 |
Provision
of light fitting (minimum IP65 type) inside canopy c/w switch near access
door. |
|
|
||
|
8 |
1000
litres sub-base fuel tank capacity correct and sufficient for 6 hours
continuous operation. Details of fuel top-up and drainage shown |
|
|
||
|
9 |
Fuel
top up location to be near entrance for easier fuel top up |
|
|
||
|
10 |
Provision
of battery rack and provision of calculations to confirm sufficient capacity
for cranking 6 times |
|
|
||
|
11 |
Provision
of lifting eyes for hoisting purposes |
|
|
||
|
12 |
Provision
of calculation for confirmation of quantity and type of vibration isolators.
Vibration isolators shall also be provided with neoprene pads. |
|
|
||
|
13 |
To
include comment for contractor to submit the calculation and catalogue to
Acoustic Consultant for review. |
|
|
||
|
14 |
Colour
of canopy to be advised by Architect. Painting schedule to be provided. |
|
|
||
|
15 |
Provision
of earthing boss to connect to lightning protection |
|
|
||
|
16 |
Provision
of built-in ladder to access top of canopy set for maintenance |
|
|
||
|
17 |
Provision
of viewing window should not turn yellow as it ages. (e.g.
non-UV stabilised plastics, acrylics, etc.). |
|
|
||
|
18 |
Provision
of ironmongeries (i.e. hinges, handles, locks, etc.) to be of non-rusting
type (e.g. stainless steel) |
|
|
||
|
19 |
Door
locks shall be openable from inside to avoid man trap situation during
maintenance |
|
|
||
|
20 |
Rubber
stopper on every door to prevent banging |
|
|
||
|
21 |
Cable
entry details shown and c/w weather shield and fibre cable gland plate.
Cables shall be housed inside hot dipped galvanised cable tray/ladder c/w galvanised
cover and cables are not directly exposed to weather |
|
|
||
|
22 |
Drainage
for rainwater provided for cases whereby canopy set air intake and/or air
discharge are facing upwards |
|
|
||
|
23 |
Sufficient
distance between air intake and blank wall (minimum 1m) and/or between air
discharge and blank wall to allow proper air intake and discharge |
|
|
||
|
24 |
Cap
for exhaust pipe whereby exhaust pipe outlet is facing upwards to prevent
rainwater during non-usage. Sufficient space shall be catered to allow for
cap opening |
|
|
||
|
25 |
Provision
of BMS interfacing points for monitoring purpose. (Refer to Schedule 2 for BMS Point
Schedule) |
|
|
||