GUIDELINES FOR PLANNING OF SUBSTATIONS, SWITCHROOMS, GENERATOR ROOMS & RISERS

A            APARTMENTS

 

1.0               SP PowerGrid  Substation Requirements

The following sizes are only indicative and consultations have to be made with SP PowerGrid for each and every project.

              1.1            Maximum Demand less than 1 MVA (850 kW) i.e. single transformer

                 1.2             Maximum Demand less than 2MVA (1700kW) i.e. with 2 nos. 1 MVA transformers

 

                 1.3             For very large widespread sites, SP PowerGrid may agree to locate the transformers at more than one location, e.g., if 4 transformers were required, they may agree to have two locations, i.e. one group together with the Switchgear room and the other group “remote” transformer away from the switchgear room not more than 200m

 

                 1.4             For very large development, SPPG may ask for a 22/6.6 KV substation at the peripheral of the site with direct access from public road plus 6.6 kV ring main stations within the development. E.g., for Meyer Road Condominium (3 Blocks, total 460 units), SPPG asked for 1 no. 31 m x 27 m x 5.5 m (H) 22/6.6 KV substation plus 1 no. 12.4 m x 8 m x 3.6 m (H) double ring main station for each block (size inclusive of Consumer's LV switch room).

 

2.0          Consumer's Main LV Switchroom

                 2.1          Depth of main switchboard - use 1.2 m.

 

                 2.2          Clearance at back and sides - allow 0.6 m.

 

                 2.3          Clearance in front with switchgears withdrawn should have at least 0.6 m, for working. Typically, 1.5 m in front assuming switchgears on withdrawn position will not exceed 0.9 m.

 

                 2.4          Switchboards may be arranged in one horizontal length, L-shape, or two separate panels facing each other. 

 

                 2.5          The basic distribution scheme should be drawn up in order to determine the switchboard length [such as no. of feeders, generator feeder, essential to normal changeover, no. of apartment feeders (cable risers or busbar risers), etc.].

 

                 2.6          The length of switchboards may be estimated as follows:-

Main Incomer                  1000 A to 1600 A          - 800 mm

Bus Coupler                    1000.A to 1600 A          - 800 mm

Branch MCCBs                2 to 3 nos. 400 A to 800 A       - 600 mm

Branch MCCBs                3 to 4 nos. 100 to 350 A          - 500 mm

ATS                                 800 A to 1200 A            - 800 (W) x 1200 (H)

400 A to 700 A             - 600 (W) x 800 (H)

Meter Panel                     600 mm x 500 mm

          2.7          The headroom of the switchroom should be taken into consideration whether top entry or bottom entry arrangement.

 

          2.8          Appendix 'A' gives suggested layout of switchrooms.

 

3.0       Generator Room

                 3.1             Establish the major essential loads that require standby generator supply, e.g., basement carpark ventilation, basement sprinklers, lifts , etc. Estimate the above loads and derive the generator capacity.

 

                 3.2             A summary of the generator capacity of various apartments is given in Appendix 'B'.

 

                 3.3             Fuel:        In general, try to install the maximum capacity allowed by FSB in the generator room (i.e., 1000 litres as stated in SS-532 Storage of Flammable Liquids), without having to provide fire rated walls around the tank. Hence, there is no necessity to provide underground storage tank if capacity is up to 667 KVA, derived as follows:-

1000 litres - 6 hrs - 0.25 litres/KVA/hr

= 667 KVA

(6   hours as per Clause 11.7 of CP31)

 

                 3.4             The location of the generator room should take into consideration the air Intake and exhaust and future removal. The most preferred location is on 1st Storey.

 

Layout 1

Layout 2

 

 

 

 

KVA

150 - 250

300 - 400

450 - 600

750

1000

1250

A (mm)

800

1000

1500

1800

2000

2000

B (mm)

2800

3200

3800

4100

5000

5200

C (mm)

1200

1300

1700

1900

1900

1900

D (mm)

700

800

1200

1200

1500

1500

E (mm)

600

600

700

700

800

800

F (mm)

1800

1800

1800

1800

1800

1800

G (mm)

900

900

900

900

900

900

Clear Height
of Room (mm)

3500

3500

3800

4000

4000

4000

Radiator Exhaust Louvre(Gross Area)

1.5 m2

2.5 m2

3 m2

4 m2

5 m2

5 m2

Intake Louvre (Gross Area)

4 m2

5 m2

7.5 m2

9 m2

10 m2

12 m2

Layout 1 (mm)

4400 x
3800

5000 x
3900

6100 x
4400

6700 x
4600

7800 x
4700

7900 x
4700

Layout 2 (mm)

5500 x
3000

6100 x
3100

7200 x
3500

7800 x
3700

8900 x
3700

9100 x
3700

For Planning,

ask for

5500 x
3000 x
3500 (H)

6500 x
3500 x
3500 (H)

6500 x
4500 x
4000 (H)

8000 x
4000 x
4000 (H)

9000 x
4500 x
4000 (H)

9500 x
4500 x
4000 (H)

4.0       Risers

                 4.1             Basing on centralized meters, cable risers, and single phase meters for each apartment.

 

_Pic63

 

_Pic85

 

Appendix A

A.   Single Feeder with GenSet

A1 Single Line Diagram

 

A2 Switchboard layout

 

A3 Switchroom Layout

 

 

B.       Two  Feeders with Genset

B.1      Single Line Diagram

B2 Switchboard Layout

 

B3 Switchroom Layout

 

 

C       Single Feeder without Genset

 

 

D       Double Feeder without Genset

 

B   OFFICES

 

1.0                 SP PowerGrid  Substation Requirements

                 1.1           Generally for load up to 2 MVA, SPPG can supply at LV. For loads greater than 2 MVA, the supply intake is usually at 22kV.

 

                 1.2         For LV supply, the consumer does not need to invest on HV switchgears and transformers. However, the tariff is about two times that of HV tariff and more space will be required at ground floor for SP PowerGrid’s transformers.. An electrification scheme should be worked out to determine the cost benefit, if any, for HV supply even though the load may be less than 2 MVA.

 

                 1.3         In some cases, even though the supply intake is 22 KV, SP PowerGrid may ask for transformer room(s) adjacent to their switchroom; this is for their own use (for street lighting, some developments, etc.).

 

                 1.4         Typical sizes of SP PowerGrid 22 KV substations are as follows:-

 

Building

Declared Demand

(kW)

Overall Size

(L x W )

Remarks

MayBank Building

 

6.5m x 6.5m

Special layout located at 5th Storey

DBS Building 2

7,700

10m x 8m

 

Concourse

6500

9.4m x 7.3m

 

Hitachi Tower

4,000

10m x 7.3m

 

Keppel Tower

2,200

9.9m x 7.4m (S/S)+ 3.9m x 4m (T/F)

*SPPG requested for a transformer (T/F) room

Phoenix Tower

3,000

11.6m x 6.6m + 3.9m x 4m (T/F)

*SPPG requested for a transformer (T/F) room

2.0                 Consumers' HV Switchroom

                 2.1         The number of feeders for 22 kV supply is usually two (regardless of how low the load). For loads more than 12 MVA, SPPG may ask for 4 feeders (in which case we need 4 couplers) or even a 66 KV substation.

 

                 2.2         The size of consumers' 22 KV switchroom can be estimated as follows:-

 

Length

=

No. of transformers x 900 mm (AIS) or 600mm (GIS)

 

 

+

 

 

No. of incoming SPPG feeders x 900 mm (AIS) or 600mm (GIS)

 

 

+

 

 

No. of couplers  x 1400 mm + 1500 mm (total clearance on both ends)

Width

=

5000 mm

Height

=

3500mm

 

                 2.3       If there is a possibility of any future additional transformers, then the length of the HV switchroom should be increased accordingly.

 

                 2.4       The location of the HV switchroom need not be at the same level as the SPPG substation. However, if the HV Switchroom is at different level, the 22kV Service Cables will be supplied, installed and maintained by the customer.

 

                 2.5       Doors to the switchroom should be centrally located, otherwise, two doors should be provided  one no. say 1800 (W) x 2400 (H) for switchgear panels removal and one no. 900 (W) x 2100 (H) for emergency escape.

3.0                 Consumers' LV Switchrooms

                 3.1             Main LV switchrooms should be located very near or adjacent to the associated transformers to reduce voltage drop and reduce cost of the busbar feeders.

 

                 3.2             Typical sizes of LV switchboards are as follows:-

 

Gross Area (excluding

No. of

 

 

Building

carparks)

Storeys

MSBs (WxD)

EMSBs(WxD)

DBS Building Extension

65,744 m2

37

8.6 x 1.2 + 8.2 x 1.2

2.2 x 1.0 (750KVA G ) + 2.5x1.0 (750KVA G )

Concourse

93,899 m2

42

6.7 x 1.2 +

 5.6 x 1.2 +

 8.1 x 1.3

3.4 x 1.2 (1250 KVA) + 3.4 x 1.2 (1250 KVA) + 4.2 x 1.2 (1250 KVA)

Hitachi Tower

45,000 m2

37

9.5 x 1.2 +

 5.3 x 1.2

5.3x1.0 (1000KVA G ) +5.3x1.0 (1000KVA G

Phoenix Tower

25,580 m2

23

8.8 x 1.0

4.7x0.6 (1000KVA G )

Keppel Tower

30,000 m2

27

6.1 x 1.2 +

5.0 x 1.2

3.8 x 1.0 (750 KVA G )

3.8 x 1.0 (750 KVA G )

 

                 3.3            Two doors should be provided as per Authority’s requirement;  one no. say 1400 (W) x 2100 (H) and one no. 900 (W) x 2100 (H).

 

                 3.4            Consider routing on incoming and outgoing feeders.

 

                 3.5            Typical LV Switchroom sizes

a.                     2 Feeders and one essential board

 

 

 

ii)     3 feeders and one essential board

 

 

5.0                 Consumers' Transformer Rooms

 

            5.1          The location should take into consideration future removal/replacement of the transformer and routing of the incoming and outgoing feeders.

 

            5.2          A dividing wall between every two transformers is preferred but not absolutely essential. The wall is meant to pre-empt possibility of a flashover in one transformer from affecting the other transformer.

 

            5.3          The doors should be double leaf of about 2700 (W) x 2700 (H)  depending on the size of the transformer (excluding the housing).

 

            5.4          Limit the maximum capacity of each transformer to not more than 2500 KVA. Otherwise, the rupturing capacity of the LV switchboard will be rather high and as such, not easily available.

 

            5.5          Always group transformers in pairs. In general, try to size the capacity of each transformer to cater to 70% of the loads served by both transformers.